The quick read: Put the two bridge term sheets side by side on total dollar cost over the hold you actually expect, not on the rate. Dollar cost is interest plus lender fees plus rate cap and extension cost plus any prepayment or minimum-interest charge, minus credits. Run it three times: an early exit, your business plan, and an extended hold. In the illustrative example below, the offer with the lower spread costs more in every scenario, and $408,300 more if you sell at month 12.
What does a bridge term sheet add to a general term-sheet comparison?
A bridge term sheet adds floating-rate mechanics that a general term-sheet review can miss: minimum interest on an early payoff, interest charged on undrawn commitment, a SOFR floor, a rate cap you must buy and later replace, and an extension fee with a possible spread step-up. Those terms decide which offer costs less.
For cash at closing, interest reserve runway, recourse, covenants and whether you can meet an extension test, start with our guide to comparing CRE term sheets; this page assumes those are settled and prices the terms specific to a floating-rate bridge loan.
How do you calculate the dollar cost of a floating-rate bridge loan?
You calculate the dollar cost of a floating-rate bridge loan by adding every dollar you will pay the lender over a defined hold (interest, origination and exit fees, rate cap premiums, extension fees and any minimum-interest shortfall) and subtracting credits, then repeating the sum for an early exit, the plan, and an extended hold.
The formula is simple: dollar cost = interest + lender fees + rate cap and extension cost + prepayment or minimum-interest cost, minus credits. The work is in the inputs. Interest depends on the index, the spread, any index floor, and whether interest accrues on the funded balance or on the full commitment. Fees depend on their base: a 1% fee on a $10 million commitment is $100,000 even if only $8 million funds at closing.
Most bridge loans float over the Secured Overnight Financing Rate (SOFR). FRED's SOFR series, from the Federal Reserve Bank of New York, printed 3.93% for November 16, 2026, and FRED's 30-day average of SOFR stood at 3.92% on November 17, 2026. On October 28, 2026, the Federal Open Market Committee held the federal funds target range at 3-3/4 to 4 percent, according to the Fed's statement. Use the current index level in your model, and also run a lower and a higher index level, because a floor or a cap changes the answer at the edges.
Model three holds, because each term sheet punishes a different outcome. Minimum interest punishes the early exit. Extension fees and new rate caps punish the slow one. Only the middle case is the one you planned for, and bridge plans rarely land exactly on schedule.
Which floating-rate bridge terms change the cost the most?
The terms that change bridge loan cost the most are the ones that bite only in a specific scenario: minimum interest or spread maintenance on an early payoff, interest charged on undrawn commitment, index floors, a rate cap you must replace to extend, and an extension fee or spread step-up on a slow plan.
Use this checklist on both term sheets. Ask for each item in writing before you sign either one.
Table: Floating-rate bridge term checklist, what to ask and why it moves your dollar cost
| Term | What to ask the lender | Why it moves your cost |
|---|---|---|
| Term SOFR tenor, floor and reset | What to ask the lender One-month term or daily average; floor level; reset date | Why it moves your cost A floor sets the minimum rate you pay |
| Term Interest on funded vs committed | What to ask the lender Does interest accrue on undrawn holdback? | Why it moves your cost Interest on unfunded dollars is pure cost |
| Term Fee base | What to ask the lender Origination and exit fees on commitment or funded amount | Why it moves your cost A fee on the commitment is paid on money you may never draw |
| Term Minimum interest and spread maintenance | What to ask the lender Months of interest owed on early payoff | Why it moves your cost Sets the cost of selling or refinancing early |
| Term Rate cap requirement | What to ask the lender Strike, term and who buys it at closing | Why it moves your cost The premium is a closing cost on top of fees |
| Term Rate cap replacement at extension | What to ask the lender New strike and term required to extend, and who pays | Why it moves your cost A new cap at extension can cost as much as the fee |
| Term Extension fee and step-up | What to ask the lender Fee per extension and any spread increase | Why it moves your cost Raises the cost of every month past the initial term |
Price the extension as a package: the fee, any spread step-up and the replacement cap together. If your current loan matures in the next 6 to 12 months, ask now whether that package costs more than refinancing.
How do two bridge term sheets compare in a worked example?
In this illustrative example, built on no real YieldStack deal, Offer A carries the higher spread but costs less over every hold, because Offer B charges interest on the full commitment from closing, takes a larger origination fee and requires 18 months of minimum interest that a month-12 sale cannot escape.
Our arithmetic assumes a $10 million commitment: $8 million funded at closing and a $2 million renovation holdback drawn in full at month 6, with a 24-month initial term and one six-month extension. SOFR is held flat at 3.93%, the November 16, 2026 FRED print. Both lenders require a rate cap, priced here at $60,000 for the initial term and $25,000 to replace for a six-month extension. These cap prices are assumptions for the arithmetic, not quotes.
Offer A: SOFR plus 3.50% (7.43% all-in), 3.00% SOFR floor, interest on funded balance only, 1.00% origination on the commitment, 0.50% exit fee on the commitment, 12 months minimum interest, extension fee 0.25%, no spread step-up
Offer B: SOFR plus 3.25% (7.18% all-in), 3.75% SOFR floor, interest on the full commitment from closing, 1.50% origination, no exit fee, 18 months minimum interest, extension fee 0.50%, no spread step-up
Table: Illustrative dollar cost of two bridge offers over three holds (our arithmetic, SOFR flat at 3.93%)
| Cost item | Offer A, sale at 12 months | Offer B, sale at 12 months | Offer A, 24 months | Offer B, 24 months | Offer A, 30 months | Offer B, 30 months |
|---|---|---|---|---|---|---|
| Cost item Interest | Offer A, sale at 12 months $668,700 | Offer B, sale at 12 months $1,077,000 | Offer A, 24 months $1,411,700 | Offer B, 24 months $1,436,000 | Offer A, 30 months $1,783,200 | Offer B, 30 months $1,795,000 |
| Cost item Origination fee | Offer A, sale at 12 months $100,000 | Offer B, sale at 12 months $150,000 | Offer A, 24 months $100,000 | Offer B, 24 months $150,000 | Offer A, 30 months $100,000 | Offer B, 30 months $150,000 |
| Cost item Exit fee | Offer A, sale at 12 months $50,000 | Offer B, sale at 12 months none | Offer A, 24 months $50,000 | Offer B, 24 months none | Offer A, 30 months $50,000 | Offer B, 30 months none |
| Cost item Rate cap | Offer A, sale at 12 months $60,000 | Offer B, sale at 12 months $60,000 | Offer A, 24 months $60,000 | Offer B, 24 months $60,000 | Offer A, 30 months $85,000 | Offer B, 30 months $85,000 |
| Cost item Extension fee | Offer A, sale at 12 months none | Offer B, sale at 12 months none | Offer A, 24 months none | Offer B, 24 months none | Offer A, 30 months $25,000 | Offer B, 30 months $50,000 |
| Cost item Total dollar cost | Offer A, sale at 12 months $878,700 | Offer B, sale at 12 months $1,287,000 | Offer A, 24 months $1,621,700 | Offer B, 24 months $1,646,000 | Offer A, 30 months $2,043,200 | Offer B, 30 months $2,080,000 |
The 12-month column is the one that decides it. Offer B's interest at month 12 would be $718,000, but its 18-month minimum interest lifts the bill to $1,077,000. At the planned 24 months the gap shrinks to $24,300: the fees net out, and Offer B's interest on the undrawn $2 million holdback for six months outweighs its lower spread. At 30 months Offer B's larger extension fee widens the gap again to $36,800.
The floor matters only if SOFR falls. With SOFR at 3.93%, neither floor binds. If SOFR dropped below 3.75%, Offer B would stop getting cheaper while Offer A kept falling to its 3.00% floor. Run that case in the bridge loan calculator with your own numbers.
How do bridge lender types differ on these terms?
Bridge lender types differ most on how they price an early payoff, whether they charge interest on undrawn dollars, and how tightly they write rate cap and extension terms: in our experience, banks may carry lighter minimum interest, debt funds and balance-sheet lenders may fund capex with structured extensions, and private lenders may trade higher fees for speed.
In our experience, a bank bridge loan may come with lighter minimum-interest terms and a relationship price, in exchange for tighter leverage. A balance-sheet lender that holds the loan may negotiate an extension fee or cap replacement directly with you. A debt fund may fund future capex and lend on the business plan, and its rate cap requirements and extension terms may be written tightly. A private lender may close fastest, with higher fees and shorter terms. Treat each of these as a tendency to confirm in writing, not a rule.
That backdrop is not abstract. Trepp's CMBS delinquency rate, which measures CMBS loans rather than bridge loans, fell 15 basis points to 7.87% in October 2026, while its CMBS multifamily delinquency rate rose five basis points to 8.09%, CRE Daily reported on November 3, 2026. With delinquencies elevated, expect cap and extension conditions to be enforced as written.
Bank: may carry lighter minimum interest and relationship pricing
Balance-sheet lender: may negotiate extensions directly
Debt fund: may fund capex, often with tight cap and extension terms
Private lender: may close fastest, often at a higher dollar cost
How do you get bridge term sheets you can compare side by side?
The most direct route to comparable bridge term sheets is a brokerage that submits one complete deal package to several lender types and puts their offers on one dollar-cost basis, and YieldStack is our top pick for that job (YieldStack publishes this guide), because it pairs software matching with brokers who negotiate on your side.
YieldStack is an AI-native commercial mortgage brokerage that arranges financing for commercial real estate investors. Three reasons it comes first here. One submission is matched against 20,000+ loan programs, so banks, balance-sheet lenders, debt funds and private lenders can quote the same deal. The median first offer arrives in under an hour, from an institutional lender. Zero upfront: submitting a deal and reviewing offers costs nothing, and the broker fee is paid only at closing.
The broker work is the comparison itself: asking every lender for the fee base, minimum interest, interest on undrawn dollars, rate cap terms and extension costs in the same format, then pushing the weaker terms in negotiation. Every credit decision is made by the lender; YieldStack arranges the introductions and negotiates on the borrower's side, and no loan, rate, or closing is guaranteed.
Ready to put two bridge offers on one page? Submit your bridge deal for side-by-side term sheets. The 5-minute submit covers the property, the plan and the payoff date. If your current loan matures soon, the same approach applies to a refinance; see where to compare commercial refinance loans before a balloon payment is due, and the bridge loan program page for how bridge financing is structured.
The bottom line
Compare two commercial bridge loan term sheets on dollar cost over three holds, not on spread. Price interest on funded versus committed dollars, the fee base, the SOFR floor, minimum interest, the rate cap and its replacement, and the extension fee. The cheaper-looking spread often loses once those terms meet an early sale or a slow plan.
Ask every lender for the same checklist in writing, run the arithmetic, and negotiate the term that costs the most in your likeliest scenario.